Case Studies

Case Study: Project 1735

Industry: Security & Property Maintenance

20240430 163015 scaled

Project 1735 is a 38 van fitout with two different specifications. These van conversions were for a client that works in the security and property maintenance sectors and with this DuraSto solution their engineers have all they need to carry out their work on site. These fitouts have been tailored to our customers specific requirements which include both standard furniture along with bespoke products unique to us at DuraSto. Please click the button below to view our video of this project.

20240501 152658 scaled

Bespoke Sheet Material Rack

These racks are a bespoke product, designed and manufactured by DuraSto. Our customer needed a solution for transporting sheet materials as well as support for cutting these material onsite.

20240501 152545 scaled

Racking

The racking on this project was an Edström system and was split over two different designs. This shelving offered a large amount of storage along with bins for small parts etc… 

20240501 152726 scaled

Electrics

The electrical requirements on this van included inverters to power sockets along with interior lights, work lights, amber strobe lights, beacons, run locks and trackers. Along with this one of the specs needed 110v power

 

20240501 152748 scaled

110v Supply

The 110v power supply involve installing a transformer that then connected to a retractable cable reel at the rear of the van. This allowed for the operator to have maximum flexibility when using this supply.

20240501 152753 scaled

Bespoke Ladder Rack

The customer required storage for a large ladder but didn’t want the added height of a roof rack. Due to the size of the ladders there was no off the shelf solution. DuraSto designed these steel hooks and had them fabricated.

Case Study: Project 1711

Industry: Heavy Plant Manufacturer

20240315 161551 scaled

Project 1711 was van conversions for a large plant machinery manufacturer. With the MAN TGE 3.180 4×4 as the foundation these vans needed to provide the engineers with a full mobile workstation. This DuraSto solution provided ample storage, a work area and numerous electrical additions.

Please click the button below to view our video of this project.

IMG 20240315 WA0002

Racking

The racking on this project was an Edström system and was split over two different designs. This shelving offered a large amount of storage along with bins for small parts etc…

IMG 20240315 WA0003

Workbench

This workbench area along with drawer storage give a great space to carry out onsight servicing or repair. Theres also a double socket for any power requirements.

IMG 20240315 WA0004

Lockable Cupboard

A lockable cupboard was a great addition for larger parts and also meant that the engineers can lock it for safety.

 

20240312 092700 1

Blindspot Camera

Blindspot cameras were just a part of the electrical fitout which also included inverters to power sockets along with interior lights, work lights, beacons, and a leisure battery.

IMG 20240315 WA0006

Handwash Unit

This unit was also part of the electrical install and provides the engineers with both hot and cold water for handwashing onsite.

About Durasto

DuraSto supplies and fits out commercial vans with the leading van racking and storage equipment in the market.

Get In Touch

Address: Durasto, Blackhedge Farm, Leckampton Hill, Shurdington, Cheltenham,
GL53 9QJ

© 2020 Durasto All Rights Reserved | Powered by Provance Media